Case Study
Built by King Enterprises IO. Operated by King Surplus.
We built the complete platform for managing surplus, idle, and end-of-life industrial assets: inventorying, photography, storage, redeployment, dismantling, recycling, inter-facility transfers, internal offerings, and final disposition, with real-time visibility at every step of the way. Our sister company King Surplus operates AMP for their industrial clients. If you need AMP, talk to King Surplus. If you want something like this built for your operation, talk to us.
Inside the Platform

Table View

Full data grid with filtering, sorting, and inline status tracking
Kanban View

Drag-and-drop phase management with card-based asset tracking
Gantt View

Timeline visualization of asset phases, milestones, and deadlines
Modular by Design
AMP is not a one-size-fits-all dashboard. Each deployment has a modular portal where clients see only the capabilities that matter to their operation. Surplus asset management, appraisals, marketplace listings, scrap, purchasing, transfers, disposals, audit management. All activated or locked based on the engagement.
Activate modules as the engagement grows
Team-based access control for every section
Real-time visibility across all active modules
Your Brand, Your Rules
Every organization is a little different. Sometimes the boss wants things in a specific order. Sometimes staff want a particular section highlighted. Sometimes the brand colors are non-negotiable. We are not against any of it. We are here to make sure the platform feels like it was built in-house.
By default, every deployment carries King Surplus branding. White-label customization (your logo, your colors, your identity) is available for a fee. Your teams can work in a platform that feels built in-house.
If you give people permission to guide the design, we will listen to them thoroughly. Plant managers, maintenance leads, executives, whoever has input. We build around their workflows.
If you have strict, rigid compliance standards, whether regulatory, environmental, customs, or internal corporate policies, we can adhere to those. The platform is built for traceability from day one.
One Platform, Every Client
The same infrastructure powers every deployment. Each client gets their own branding, authentication method, custom modules, and role-based access, all tailored to their operation.
Surplus & removals of large industrial assets · Complex export process · Bonded warehouse tracking · 456 assets


Client-branded portal · Equipment rentals · Financial reporting · Order management


White-label customization available for a fee: your logo, your colors, your identity
Flexible authentication: SSO, passwordless, or traditional credentials
Custom modules per deployment: asset tracking, task management, financials, compliance
Mobile-responsive from day one. Field teams work from any device
Secured with enterprise-grade encryption, audit trails, and role-based access
Each deployment is independent. Your data is yours alone
What We Built
Platform Capabilities
Photographed on site, on the trailer, at receiving, packaged, and shipped. Every step documented and tracked in the platform. No more spreadsheets.
Full transparency on what was sold, sale prices, fees, and net proceeds. Consolidated reporting on your schedule.
Notify anyone with proper access via text message or email at any step. Request sales, appraisals, or reviews directly from the platform.
Every action tracked, every field change logged. Complete traceability for internal and external compliance requirements.
Assign tasks, track progress, manage priorities. Keep your team aligned on what needs to happen and when.
Offer assets internally across business units with full transactional records, not just location moves. Transfer between facilities, coordinate removal and relocation.
A permanent outlet for your continuous surplus streams. Recycle, redeploy to another facility, sell through our network and marketplace channels, or coordinate removal and relocation based on what makes sense for each asset.
Bonding, duties, and tariff calculations for exporting capital assets into or out of the US. Full compliance tracking for international surplus movements.
Built For
We designed AMP for large manufacturers and industrial operators who generate continuous surplus, idle, or end-of-life assets. If your facilities need to inventory, store, redeploy, dismantle, recycle, or sell equipment and materials across multiple locations, AMP is built for you.
Coordinate surplus across multiple sites. Transfer, redeploy, or consolidate assets between facilities with full transactional records and real-time visibility.
Manage continuous streams of surplus equipment and materials. Storage, redeployment, dismantling, recycling, and sales at scale without the spreadsheet chaos.
Full audit trails, bonded warehouse tracking, customs and tariff calculations, environmental compliance, and controlled disposition for operations that demand it.
If you need AMP for your surplus operation, King Surplus handles everything: onboarding, deployment, and ongoing management.
If you want custom software built to solve a problem nobody else has solved, that is what we do. Let us build it.